House Extension Project in Leyton E10

As quite often happens these days - previously there was a tired conservatory, which was used for all the stuff that accumulates over many years. Initially this project looked as pretty straightforward: build a small extension to the side of existing bathroom annex, join this space with a dining room and construct a roof covering the existing bathroom. When we started ground works, we discovered many soil pipes, joining from all directions, not to mention the manhole re-positioning. So, the main challenge became having a very limited garden space, work around with materials and dug out soil, underground steels installation. Project that normally would take up to two months to complete took nearly three months. But, most importantly, in the end the customer was happy and it was all worth it. Below - images of what this property looked like before us and how we progressed.

Project Details

  • Project costs:
  • Completion Date: March 2015
  • Duration: around 3 months
  • Project type: House Extension

Related Projects